Here’s what it is looking like after the roof was finished.

Oct 10 09 a 027

All this wil be smoothed over with cement to make the walls straight and beautiful.

Oct 10 09 a 028

This is standing where the kitchen table will be and looking into the kitchen.

Oct 10 09 a 031

This is standing in the kitchen looking into the bedroom.

Oct 10 09 a 033

This is standing in the kitchen looking to the entrance.

Oct 10 09 a 034

This is standing in the bathroom.  Closest door is the second bedroom.  Next door is the living room.

Oct 10 09 a 035

This is standing in the living room.  Front door to the left, step up to the kitchen area to the right.

Oct 10 09 a 042

Standing on the step looking into the living room.

Oct 10 09 a 041

This is standing in the living room looking out of the square window onto the porch.

Oct 10 09 a 044

And there you have it.  Looking good, huh??!!!  I think it’s going to turn out great!

The blocks are going up between the walls and the ceiling.  This is a view standing where the kitchen table will be looking down the hallway to the bathroom.  There will be a bookshelf on the right.  The first door on the left is to the living room and the second is to the 2nd bedroom.  It is looking great!

Oct 8 09 b 003

…and we are HAPPY!

Oct 8 09 b 017

We stacked and prepared the rented materials to return.

Oct 6 09 a 008

They began carrying block and mixing cement to fill in the gaps between the walls and the ceiling.

Oct 6 09 a 014

more photos to come…

The supports were removed on Monday and……

Oct 5 09 a 015

Oct 5 09 a 016

it’s still standing!

Oct 5 09 a 007

It looks solid and great.  We are happy with the results.

Oct 5 09 a 006

I like the details that the carpenter did on the front.

Oct 5 09 a 011

Here is the view from the kitchen looking out the front to the living room.

Oct 5 09 a 008

This is standing almost it the same place, but looking over to the right a bit more at the front entrance.  The door to the right is the 2nd bedroom.

Oct 5 09 a 009

This is where the stairs will be to the 2nd floor.

Oct 5 09 a 014

They are placing block in between the gaps of the walls and ceiling today.  More pictures to come….

The roof is pretty much dry (except for some rain that just fell this afternoon).  The supports will come down on Monday.  I climbed up the ladder to get this photo, but was too nervous to make it all the way up.  Don’t laugh!  Have you ever been up a Haitian ladder??!  This is my photo…

Oct 2 09 a 001

Then Charly took the camera away from me to get this.  Sorry it’s blurry.  He was laughing at me.

Oct 2 09 a 007

Here is his photo…

Oct 2 09 a 003

Looks good!  More photos to come after Monday.

They got done with iron prep work around 2:30 AM on Sat morning and the cement crew came around 4:45 AM.  We didn’t get much sleep.  But, we got a lot done.

Sept 26 09 a 016

Sept 26 09 a 017

Sept 26 09 a 018

Sept 26 09 a 021

Sept 26 09 a 023

Sept 26 09 a 027

Sept 26 09 a 029

Sept 26 09 a 031

Sept 26 09 a 032

Sept 26 09 a 033

The roof is setting and we should be able to take the supports down on Oct 3-4.

It took about 1 1/2 wks to prepare the roof with the proper supports….

Sept 26 09 a 002

Plumbing…

Sept 26 09 a 010

Sept 26 09 a 009

Decoration for the front of the house.

Sept 26 09 a 005

Sept 26 09 a 004

Sept 26 09 a 003

Sept 26 09 a 001

Sept 23 09 a 013

Sept 23 09 a 018

Sept 23 09 a 021

Sept 23 09 a 026

Sept 23 09 a 032

Today, we started placing post, supports, and boards for pouring the roof.

Sept 18 09 a 001

Sept 18 09 b 002

Sept 18 09 b 003

Sept 18 09 a 002

After all the 2x4s go up, they will lay the plywood down on top.  Then, iron bars will be fastened together to form a grid on top of the plywood.  Hopefully, this will all be done by Fri, the 25th because we are planning to pour the roof on the 26th.

Sept 18 09 a 004

We have had $4000 given this week.  Praise God!  Thank you!!!

This week material were purchased and delivered for the roof. 

Sept 17 09 b 042

There are still a few more things to come (cement & some iron bars).  They have made 2 trips so far in bringing the stuff here.  They can probably get the rest in one full load or 2 half loads.  It depends if they are delivering for others in the village at that time.  So, the roof crew will start on Friday and we hope to pour the roof on Sat, 9/26.  The cement will have to dry for 3 wks before removing the supports.  After this, the house will be covered!!!  Next, we plan to have someone start working on the iron bars for the windows & porch.  After that, smooth the walls with cement, install windows and doors, lay ceramic tile, install plumbing and electric, and paint.  The end is looking near and it’s so exciting.  Thanks for all of your help!!

Sept 17 09 b 040